McKechnie and Omega Closed as a result of the NZ Govt Covid19 decision to move the country to Level 4 status.

We will reopen on April 23rd, 2020

As most of you will be aware the New Zealand Government moved the country to a Level 3 crisis status on Monday March 23rd and to Level 4 at midnight on Wednesday 25th March 2020.

This means that along with most businesses, we will be closing down from 2.30 pm on Wednesday 25th of March, 2020 for a period of four weeks. At this stage we will look to re-open on Thursday the 23rd of April 2020.

Care & Maintenance

To ensure the protection of the powder coated surface, strong solvents including paint thinners and abrasive cleaners must not be used. If paint splashes, mastics, or sealants these must be removed, using only Methylated Spirit or WGANZ recommended cleaners should be used and rinsed thoroughly post application. As with all paint films, regular washing with a soft brush and mild detergent will ensure that substances such as airborne salts and pollutants that are detrimental to long-term performance of your powder coated extrusions are expelled. Cleaning must take place at least every 6 months in external applications. In areas of high pollution such as geothermal, beachfront and industrial areas, the cleaning must take place at least every 3 months. 

WGANZ Maintenance

For more information on aluminium windows and doors maintenance, visit WGANZ. 

 

Need Help? Click Here